Vison Wavterparks provides life long service for our equipment, any problem please feel free to contact us.
Once the Aqua park has finished you and the park are part of our partners, and our commitment with you will continue, helping you to preserve the quality of the rides so they can always looking like new by offering the maintenance & accessories for each and every project.
Additionally every year we’ll help you in improving and adding new attractions to your park.
Out of that, we provide following service by charge reasonable cost: Water park consulting and training, equipment performance testing, protection and renovation of facilities, and emergency equipment maintenance and replacement.
The specific services are as follows:
I. Training and Consulting
1. Operation, maintenance and simple repair training for water park mechanical and electrical equipment and automation system;
2. Emergency training for water park attendants and lifeguards;
3. Water park market promotion training;
4. Maintenance and protection training for fiberglass products;
5. Management training for daily purification and disinfection of water and so on.
II. Performance Testing and Debugging for Water Park Equipment
1. Test and debug the newly installed or reformed slides and wave making equipment;
2. Test and evaluate the surfaces and functional properties for fiberglass products (slide, water equipment) because of theirs placement or long service life;
3. Test and assess the safety of water park products and their accessories destroyed by natural disasters such as typhoons, earthquakes, floods, tsunamis and so on;
4. Test and assess the use condition of special equipment with more than or nearly more than 10 years service life;
5. Improve and upgrade the diagnosis for old districts or districts with poor management;
III. Water Park Equipment Protection and Refurbishment
1. Take measures to protect and maintain slides, swimming equipment and pools before the open time in summer and during the close time in autumn;
2. Clean dirt in thermal water or other slides which are easy to form solid object on the surface;
3. For the products with long service life, slides or other fiberglass products with larger abrasion on the surface, take measures to refurbish them;
4. Due to usage time or other reasons, the water makers, the air pipe and control valve are corroded and the equipment will be affected in operation. Take measures like renovation and anti-corrosive treatment, and the intelligent control program can be upgraded for customers.
5. Do professional anti-corrosion paint and topcoat update for slide steel structure and water house structure;
IV. Emergency Maintenance and Replacement for Water Park Equipment
1. Emergency maintenance and parts replacement for water pump and electronic control system;
2. Emergency maintenance and parts replacement for wave maker and control program;
3. Emergency maintenance and parts replacement for glass and steel products such as water slide and water playing equipment;
4. Emergency maintenance and parts replacement for water treatment equipment and heating and constant temperature equipment;
5. Emergency maintenance and parts replacement for pipeline system and various valves;
Maintenance service for water slide:
Fiberglass Service
Solving water leakages
Smoothing joint gaps
Cleaning and polishing surfaces
Repainting
Repairing fiberglass/gel coat cracks and chips
Performing seasonal maintenance
Steel-Structure Service
Examining bolts, nuts and washers
Checking anchor bolts
Repairing and repainting rusted surfaces
Carrying out seasonal maintenance.
Water Play Structures, Kids Play & Aquatic Attractions Service
Cleaning steel and fiberglass surfaces
Repainting steel structures
Removing and replacing interactive toys
Repairing and repainting kids’ attractions
Performing seasonal maintenance.
Adjust Pump to Ensure Most Efficient Volume
An inspection of water slide mechanical is made to ensure proper functioning equipment. Water pumping components and equipment are adjusted to ensure the most efficient use of power and water and will be lubricated if required.
Electric control box
Full examining the control box
Any request will feedback within 24 hours. Any emergency about the water park operation, we will send engineer to the site within 48 hours(available for visa-free country only).
Gallery